• Feb 28, 2026 liaison diasorin manual rify that the work surface can support the weight of the analyzer. Ensure proper ventilation and access to network connections. Unpacking and Assembly Follow these steps: Carefully unpack all components and verify against the packing list. Place the analyzer on By Alonzo Gerlach